The project in the design phase;
The design geometry, the use of current materials and systems,
feasibility and material preferences are evaluated by considering
the manufacturing and assembly times, especially the country
conditions. Risk-posing preferences and designs are discussed with
the employer, and solutions are suggests.
|
Construction method, details,
material and system preferences are examined in projects that design
phase has been completed. The issues to be saved cost without
affecting the design criteria are discussed with the Employer and
revisions are complated the projects and specifications. |
Cost savings are determined in
the project and specifications before and during the tender phase.
Alternative systems and materials are recommended. Pre-procurement
changes are made in consultation with the employer. Progress is made
in accordance with the work schedule and budget. |
In the field part of the project
where serious cost increases occur especially with air cargos,
unplanned cost increases are prevented by providing cross controls
during the purchasing phase. Solutions, including local
possibilities, are discussed with Employer in country conditions.
Necessary manufacturing method, assembly and work time changes are
made in the field. |