INTER SL provide material and
system solutions services in terms of "Correct Material",
"Cost Control", and "On Time Delivery" concepts. It meets the
procurement and control needs of investor, owner, construction and
installation companies in all processes, including from design to
installation stages and guarenty periods.
SUPPLY SOLUTIONS
Architectural |
Structural
|
Interior
Design |
Special
Materials |
INTER Material and INTER
Management are professional groups which
expert in their own disciplines of INTER SL.
Please
download our:
Summary
Material and System
Catalogues |
Architectural
References
Catalogues |
Interior
References
Catalogues |
 |
 |
 |
Please download
our
detail catalogues for product
base
ongoing projects:
INTER SL provide cost
saving solutions about material and system procurement with its
experiences different scales and functions of projects.
PROJECT SPECIALITY
 |
• Multifunctional Commercial
Buildings |
 |
• Olimpic and Sports Complexes |
 |
• Hospitals and Health Centers |
 |
• New Concept Shopping
Malls |
 |
• Industrial Facilities |
 |
• Airport Projects |
 |
• Theme Parks |
 |
• Hotels |
 |
• Cultural Buildings |
 |
• Educational Facilities |
 |
• Road and Railway Projects |
 |
• Mixed Use Residential
Buildings |
 |
• Lanscape and Environmental Projects |
click here to see
projects
Special
Downloads
Theme Parks - 360 Fly
Adventure Video
CORRECT MATERIAL
Determining of
requirements for procurement materials needs profeciency, experiment and
knowledge.
Simple procurement
duration do not analyse previous technical conditions and requirements.
This situation is the most common problem for all procurement operations.
Unconscious procurements cause to raise of project owner's costs lack
off anyone's concern.
INTER SL provides
cross control between material and its projects, analyse technical
specifications and place for use, informs to owner when requires changes
and provides correct specifications for the material before procurement
operations.
COST CONTROL / VALUE
ENGINEERING
In order to provide cost
saving before the procurement stage we should to control previous step,
that is project and specification phase. Because the design, material
description or technical specification changes are causes serious waste
of time and cost at the procurement step.
INTER SL combining
cost control studies with international and multifunctional projects
with project and application experience, provides project and
specification control at the procurement stage, checks the adequate and
accurate description of the need, and submits changes and suggestions
for the approval of the employer to reduce the cost when necessary.
TIMING
Significant time losses often happened in the procuremet process. But, it is very
difficult for the project's owner to detect these losses when the
project continues.
To overcome this
situation it is necessary to act consciously at the phases which causes
loss of
times.
These losses usually
occur in the following stages;
- Preparing the tender
documents (including project phase)
-
Receiving proposals from suppliers
-
Correction of proposal differences
-
Preparing the comparison tables
- Interviews with companies and selection
Loss of time occur in
each of the above processes and generally project's costs increase due
to late determination of time losses in procurement phases by project
owner. Thus schedule of installations, transportation or manufacture
phases tightens.
In this stage INTER SL lead all phases in order to prevent time losses for saving client
rights, quality of material and manufacture and on time delivery to
site.
Provides the necessary
technical specifications and information in the proposal documents,
performs the correct bid file formation.
With the proposal documents's complete in a short time, the firms
performs quick and one-time bidding returns.
PROJECT REFERENCES
 |
 |
FACULTY of SPORTS
Project Budget: $
25 M
Total 15.000 sqm closed area
TURKMENISTAN
|
MINISTRY of SPORTS
Project Budget: $
35 M
Total 28.000 sqm closed area
TURKMENISTAN
|
 |
 |
DORMITORY BUILDING
Project Budget: $
12 M
Total 12.000 sqm closed area
TURKMENISTAN
|
MULTI-PURPOSE SPORTS HALL
Project Budget: $
10 M
Total 7.000 sqm closed area
TURKMENISTAN
|
 |
 |
MATERNITY HOSPITAL
Project Budget: $
75 M
Total 17.200 sqm closed area
TURKMENISTAN
|
NEBITDAG DIAGNOSTIC CENTER
Project Budget: $
22 M
Total 6.900 sqm closed area
TURKMENISTAN
|
 |
 |
CHORCOW DIAGNOSTIC CENTER
Project Budget: $
21 M
Total 6.900 sqm closed area
TURKMENISTAN
|
MATERNITY and CHILD HOSPITAL
Project Budget: $
134 M
Total 15.400 sqm closed area
TURKMENISTAN
|
 |
 |
REFSHALEØEN PORT (Green Energy)
Project Budget: $ 15 M
36.500 sqm closed area
DENMARK
|
SOCHI OLIMPIC VILLAGE
Project Budget: $ 11 B
1.000.000 land area, 1.200.000 sqm closed area
RUSSIA
|
 |
 |
DAKAR SPORTS CENTER
Project Budget: $ 100 M
35.200 sqm closed area
SENEGAL
|
NIAMEY HOTEL
Project Budget: $ 60 M
17.800 sqm closed area
NIGER
|
 |
 |
PROMA HOTEL AND SHOPPING
MALL
Project Budget:
$ 122 M
68.500 sqm total closed area
IRAN |
EURASIAN BANK&ADMIN.
BUILDING
Project Budget:
$ 22 M
13.500 sqm closed area
KAZAKHSTAN |
 |
 |
NTC TELECOMMUNICATION
BUILDING
Project Budget:
$ 100 M
88.000 sqm closed
area
SUDAN
|
TURKMENBASHI INTERNATIONAL PORT
Project Budget: $ 2,100
B
1.100.000 sqm closed area, 2.100.000 sqm site area
TURKMENISTAN
|
 |
 |
ASHGABAT
OLYMPIC COMPLEX
Project Budget: $ 4,950 B
450.000 sqm closed area, 513.000 sqm site area
18
different olimpic sports buildings and hotels
TURKMENISTAN
|
ASB
INTERNATIONAL AIRPORT
Project Budget: $ 2,250 B
410.000 sqm closed area
total 205 different passenger and mainantence buildings
TURKMENISTAN |
 |
 |
SENEGAL EXPO CENTER&HOTELS
Project Budget: $ 110 M
24.200 sqm closed area
SENEGAL
|
ORA ENTERTAINMENT
CENTER
Project Budget:
€ 275 M
360.000 sqm
closed area
TURKEY |
 |
 |
FORUM MERSIN SHOPPING MALL
Project Budget: $ 150 M
140.000 sqm closed area
TURKEY |
FORUM ANTALYA SHOPPING MALL
Project Budget:
$ 250 M
230.000 sqm
closed area
TURKEY |
 |
 |
PREMIUM RESIDENCES&OFFICES
Project Budget: $ 15 M
26.500 sqm closed area
TURKEY
|
MUNICIPALITY BUILDING
Project Budget: $ 18 M
34.000 sqm closed area
TURKEY |
 |
 |
OZYEGIN UNIVERCITY CAMPUS
Project Budget: $ 285 M
100.000 sqm closed area, 210.000 sqm site area
TURKEY
|
NEOMARINE SHOPPING MALL
Project Budget: $ 80 M
81.500 sqm closed area, 35.000 sqm site area
TURKEY
|
 |
 |
PETRONAS GAS & ENERGY TERMINAL
Project
Budget: $ 280 M
95.000 sqm closed area
TURKMENISTAN
|
ASHGABAT GAS TURBINE POWER PLANT
Project
Budget: $ 60 M
64.600 sqm closed area
TURKMENISTAN
|
 |
 |
NEBITDAG GAS TURBINE POWER PLANT
Project
Budget: $ 75 M
62.000 sqm project area
TURKMENISTAN
|
ABADAN GAS TURBINE POWER PLANT
Project
Budget: $ 50 M
55.000 sqm project area
TURKMENISTAN
|
 |
 |
TEJEN AMONIA&UREA PLANT
Project
Budget: $ 260 M
600.000 sqm project area
TURKMENISTAN
|
KELETE CEMENT PLANT
Project
Budget: $ 140 M
290.000 sqm project area
TURKMENISTAN
|
|